Signs of Success®

YESCO Teamwork for the Win

 

 

Two identical 135′ pylons with 50′ tall LED displays for the Banc of California Stadium had to be fabricated and installed simultaneously on an expedited schedule. And so, we went to work. One was built in Salt Lake City and the other in Phoenix. One of the displays was installed by our installers from the Los Angeles region and the other by our Las Vegas crew.

 

Great show of YESCO’s teamwork and deployment of assets.

 

Share this post